This study presents a systematic optimization of GTAW welding parameters to achieve a pipe-to-pipe butt weld with a root height consistently below 2 mm when joining stainless-steel 316L material, employing the Taguchi design of experiments.

To the authors’ knowledge, no similar studies have been conducted to explore the optimization of welding parameters specifically aimed at minimizing weld root height under 2 mm in stainless-steel EO pipeline welding applications.

This gap in the existing literature highlights the innovative aspect of the current study, which seeks to address these challenges and improve welding precision and joint reliability.

Root height, also referred to as weld root reinforcement, is defined as the excess weld metal protruding beyond the inner surface root side of a butt-welded joint.

The input parameters considered are the welding current, voltage, speed, and root gap configurations of 1, 1.5, and 2 mm.

Welding was performed according to the Taguchi L-09 experimental design.

Nine weld samples were evaluated using liquid penetrant testing to detect surface-breaking defects, such as porosity, laps, and cracks; X-ray radiography to identify internal defects; and profile radiography to assess erosion, corrosion, and root height.

Among the nine welded plate samples, the optimal root height (less than 2 mm) was selected and further validated through the welding of a one-pipe sample.

An additional macro examination was conducted to confirm the root height and assess the overall root weld integrity and quality.

Read more

The latest news

7 Engineering Lessons Hiding in Your Holiday Kitchen 

From a spoon that gets too hot to an oven that holds up dinner, familiar kitchen moments reveal how engineers manage heat, choose materials, and...
Read more

Why Backup Power Can Fail Before a Battery Runs Flat

A charged battery does not guarantee reliable backup power. The equipment delivering that energy, the changeover from grid supply, and the devices connected to it...
Read more

5 Engineering Projects Facing Their Next Big Test in 2027

From a particle collider upgrade to a new underground railway, these five engineering projects face demanding construction and testing milestones as 2027 approaches. Here is...
Read more
Engineering Institute of Technology