The interconnection of wind power plants (WPPs) with distribution networks has posed many challenges concerned with voltage stability at the point of common coupling (PCC).

In a distribution network connected WPP, the short-circuit ratio (SCR) and impedance angle ratio seen at PCC (X/RPCC) are the most important parameters, which affect the PCC voltage (VPCC) stability. Hence, design engineers need to conduct the WPP siting and sizing assessment considering the SCR and X/RPCC seen at each potential PCC site to ensure that the voltage stability requirements defined by grid codes are provided.

In various literature works, optimal siting and sizing of distributed generation in distribution networks (DG) has been carried out using analytical, numerical, and heuristics approaches.

The majority of these methods require performing computational tasks or simulate the whole distribution network, which is complex and time-consuming. In addition, other works proposed to simplify the WPP siting and sizing have limited accuracy. To address the aforementioned issues, in this paper, a decision tree algorithm-based model was developed for WPP siting and sizing in distribution networks.

The proposed model eliminates the need to simulate the whole system and provides a higher accuracy compared to the similar previous works.

For this purpose, the model accurately predicts key voltage stability criteria at a given interconnection point, including VPCC profile and maximum permissible wind power generation, using the SCR and X/RPCC values seen at that point.

The results confirmed the proposed model provides a noticeable high accuracy in predicting the voltage stability criteria under various validation scenarios considered.

Read More

The latest news

7 Engineering Lessons Hiding in Your Holiday Kitchen 

From a spoon that gets too hot to an oven that holds up dinner, familiar kitchen moments reveal how engineers manage heat, choose materials, and...
Read more

Why Backup Power Can Fail Before a Battery Runs Flat

A charged battery does not guarantee reliable backup power. The equipment delivering that energy, the changeover from grid supply, and the devices connected to it...
Read more

5 Engineering Projects Facing Their Next Big Test in 2027

From a particle collider upgrade to a new underground railway, these five engineering projects face demanding construction and testing milestones as 2027 approaches. Here is...
Read more
Engineering Institute of Technology