Peak load reduction is one of the most essential obligations and cost-effective tasks for electrical energy consumers. An isolated microgrid (IMG) system is an independent limited capacity power system where the peak shaving application can perform a vital role in the economic operation.

This paper presents a comparative analysis of a categorical variable decision tree algorithm (CVDTA) with the most common peak shaving technique, namely, the general capacity addition technique, to evaluate the peak shaving performance for an IMG system.

The CVDTA algorithm deals with the hybrid photovoltaic (PV)—battery energy storage system (BESS) to provide the peak shaving service where the capacity addition technique uses a peaking generator to minimize the peak demand. An actual IMG system model is developed in MATLAB/Simulink software to analyze the peak shaving performance.

The model consists of four major components such as, PV, BESS, variable load, and gas turbine generator (GTG) dispatch models for the proposed algorithm, where the BESS and PV models are not applicable for the capacity addition technique. Actual variable load data and PV generation data are considered to conduct the simulation case studies which are collected from a real IMG system.

The simulation result exhibits the effectiveness of the CVDTA algorithm which can minimize the peak demand better than the capacity addition technique. By ensuring the peak shaving operation and handling the economic generation dispatch, the CVDTA algorithm can ensure more energy savings, fewer system losses, less operation and maintenance (O&M) cost, etc., where the general capacity addition technique is limited.

Read More

The latest news

Why EIT’s New Applied Research Programs Could Be Your Next Big Academic Move

What if the next stage of your engineering journey is not about learning more, but doing more with what you already know? Many students and...
Read more

Degrees Matter, Only If They Can Prove You Can Do the Job

What does it really mean to be ‘ready’ in engineering today – knowing the theory, or being able to prove you can apply it? In...
Read more

Asset Integrity in Safeguarding Engineering Projects

What makes an engineering project successful? Is it achieving project timelines, staying within cost targets, and meeting specific design specifications - or ensuring sustained performance...
Read more
Engineering Institute of Technology