Electrical Demand Uplift and Coil Performance Constraints in Air-Source Heat Pump Retrofits for Commercial Office Buildings
June 26, 2026 2:55 pm Keywords: air-source heat pump; building electrification; retrofit feasibility; electrical demand uplift; peak demand; hydronic systems; AHU heating coils; commercial office buildings; low-temperature heating Decarbonising existing commercial buildings requires replacing combustion-based heating systems with electrically driven alternatives such as air-source heat pumps (ASHPs). Although the energy and emissions benefits of heat...Read More