<script type="text/javascript">
  jQuery(document).ready(function(){
      /* apply only to a input with a class of gf_readonly */
     jQuery("li.gf_readonly input").attr("readonly","readonly");
  });
</script>
BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Engineering Institute of Technology - ECPv6.17.0//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Engineering Institute of Technology
X-ORIGINAL-URL:https://www.eit.edu.au
X-WR-CALDESC:Events for Engineering Institute of Technology
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Asia/Shanghai
BEGIN:STANDARD
TZOFFSETFROM:+0800
TZOFFSETTO:+0800
TZNAME:CST
DTSTART:20200101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=Asia/Shanghai:20210923T160000
DTEND;TZID=Asia/Shanghai:20210923T170000
DTSTAMP:20240627T005552Z
CREATED:20210815T165146Z
LAST-MODIFIED:20240627T005552Z
UID:21446-1632412800-1632416400@www.eit.edu.au
SUMMARY:Feasibility of Converting Overhead Transmission Lines to Underground – A Case Study
DESCRIPTION:The live presentation of this event has already taken place. To download the recording and presentation slides\, please complete the form below.\n \nPlease join Professor Akhtar Kalam\, EIT Academic Board Chairman\, to gain an insight into an Australian case study on converting overhead transmission lines to underground. \nThis webinar will present on various aspects of the 220 kilovolt (kV) transmission lines crossing the Waverley Park estate in Mulgrave\, Victoria. It will evaluate the feasibility of diverting the transmission lines underground. The developer of Waverley Park estate had originally intended to underground the transmission lines by means of a transition enclosure constructed at each end of the estate\, and approximately 530 meters of buried cable between the two locations. However\, the builder’s proposal was abandoned\, and the slightly realigned transmission lines were retained above ground. Included in the formal reasons for abandoning the company’s original underground proposal were visual amenity\, open space\, and financial cost concerns. \nThe presentation will identify an alternative\, preferred undergrounding solution compared to the original proposal advanced by the builder. Although broadly the same as the builder’s initially proposed concept\, the alternative solution is modeled on the 220 kV Brownhill Road substation located in Auckland\, New Zealand. From a public amenities’ perspective\, the Brownhill Road scenario is similar to that existing on the Waverley Park estate but is demonstrably superior in terms of visual amenity\, open space\, and financial cost. \nJoin us to learn more at this must-attend event for engineering professionals and aspiring engineers alike. \nReserve your spot at this free webinar today! \nThe webinar will be recorded and will be sent out to registered attendees afterwards. \nA certificate of attendance will be provided to attendees who request one near the end of the live webinar session. \nPlease note: the time stated on this event is in Australian Western Standard Time (AWST). You will need to convert this to your own time zone.
URL:https://www.eit.edu.au/event/feasibility-of-converting-overhead-transmission-lines-to-underground-a-case-study/
LOCATION:Online
CATEGORIES:Technical Engineering Topics Webinar
END:VEVENT
END:VCALENDAR